  • 216 MWCapacity
  • 72Turbines

Introduction

The Northwind windfarm consists of 72 offshore V112-3.0MW MVOW Vestas turbines, with a combined capacity of 216MW.

The project was completed in May 2014. The windfarm spans 14.5 km2 and is located on the Lodewijkbank 37km off the coast of Zeebrugge. The power is collected at one OHVS from which one 245kV export cable connects to shore. Annually it provides clean electricity for 160.000 Belgian households, and was developed by a consortium led by Parkwind BV. The stated project costs were EUR851 million.